Vaia Car

4) POINTS AND TRACK PANELS REPLACEMENT AND LAYING SYSTEMS

TRACK LAYING POINTS SYSTEM 3000
4) POINTS AND TRACK PANELS REPLACEMENT AND LAYING SYSTEMS TRACK LAYING POINTS SYSTEM 3000
DOWNLOAD AREA
TLPS3000 DATA SHEET

New Work System for Underground Railway and Urban Tramway


Do you want to know more?

WRITE US NOW

The system TLPS-3000 consists of one telescopic main beam 10300 mm length, having 4000 mm sliding length which enables a maximum extension of 14300 mm and two Hydraulic self-propelled lifting machine Type SIC-300
with crawlers.

One of the ends is equipped with a non-tractive crawler track able to lift, move and translate the whole system and able to roll on rail tracks by means of a special rail bogie.

The other end is equipped with a telescopic oscillating foot for fi nal centering of the laid switch or track panel. 4 double cylinder hydraulic devices for rail panel hooking.
Moving controls of these hooking devices are placed on the tracked hydraulic lift machines SIC-300 and can be controlled manually (standard) or by remote control (optional) as well as all other system controls.

For further information
I confirm that I have read the privacy policy
OTHER MODELS AVAILABLE